{"id":3219,"date":"2026-03-03T16:14:33","date_gmt":"2026-03-03T08:14:33","guid":{"rendered":"https:\/\/www.lctc-group.com\/?p=3219"},"modified":"2026-03-03T16:14:33","modified_gmt":"2026-03-03T08:14:33","slug":"%f0%9f%87%b7%f0%9f%87%b4-supporting-the-expansion-of-public-ev-charging-in-bucharest","status":"publish","type":"post","link":"https:\/\/www.lctc-group.com\/cs\/%f0%9f%87%b7%f0%9f%87%b4-supporting-the-expansion-of-public-ev-charging-in-bucharest\/","title":{"rendered":"\ud83c\uddf7\ud83c\uddf4 Supporting the expansion of public EV charging in Bucharest"},"content":{"rendered":"<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone  wp-image-3220\" src=\"http:\/\/www.lctc-group.com\/wp-content\/uploads\/2026\/03\/\u5e02\u653f\u53852-300x300.jpg\" alt=\"\" width=\"519\" height=\"519\" srcset=\"https:\/\/www.lctc-group.com\/wp-content\/uploads\/2026\/03\/\u5e02\u653f\u53852-300x300.jpg 300w, https:\/\/www.lctc-group.com\/wp-content\/uploads\/2026\/03\/\u5e02\u653f\u53852-1024x1024.jpg 1024w, https:\/\/www.lctc-group.com\/wp-content\/uploads\/2026\/03\/\u5e02\u653f\u53852-150x150.jpg 150w, https:\/\/www.lctc-group.com\/wp-content\/uploads\/2026\/03\/\u5e02\u653f\u53852-768x768.jpg 768w, https:\/\/www.lctc-group.com\/wp-content\/uploads\/2026\/03\/\u5e02\u653f\u53852-12x12.jpg 12w, https:\/\/www.lctc-group.com\/wp-content\/uploads\/2026\/03\/\u5e02\u653f\u53852-600x600.jpg 600w, https:\/\/www.lctc-group.com\/wp-content\/uploads\/2026\/03\/\u5e02\u653f\u53852-100x100.jpg 100w, https:\/\/www.lctc-group.com\/wp-content\/uploads\/2026\/03\/\u5e02\u653f\u53852.jpg 1177w\" sizes=\"(max-width: 519px) 100vw, 519px\" \/><\/p>\n<p>We\u2019re pleased to support the deployment of public EV charging infrastructure as part of a District 1 initiative led by Voltrelli Romania and the Bucharest City Hall. \ud83e\udd1d<\/p>\n<p>This project represents an important step toward building a scalable public charging network, with plans for approximately 300 EV charging stations across the city.<br \/>\n\ud83d\udd39 7 active locations (from 1 February 2026)<br \/>\n\ud83d\udd39 22 kW AC charging<br \/>\n\ud83d\udd39 Capacity for up to 18 vehicles simultaneously<br \/>\n\ud83d\udd39 Public rate: 1.59 lei\/kWh (VAT included)<\/p>\n<p>Designed to serve both daily drivers and enterprise fleets, this deployment supports Bucharest\u2019s wider urban decarbonisation goals while strengthening access to reliable public EV charging infrastructure.<\/p>\n<p>We value the opportunity to collaborate on projects that advance practical, city-level electrification. \ud83d\udcaa<\/p>\n<p>\ud83d\udce9 <a class=\"dGbsjCSdHqcHgjJJzMZoNubyIcMvnBkjcZpxQ\" tabindex=\"0\" href=\"mailto:hello@linkcharging.com\" target=\"_self\" data-test-app-aware-link=\"\">hello@linkcharging.com<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>We\u2019re pleased to support the deployment of public EV charging infrastructure as part of a District 1 initiative led by Voltrelli Romania and the Bucharest City Hall. \ud83e\udd1d This project represents an important step toward building a scalable public charging network, with plans for approximately 300 EV charging stations across the city. \ud83d\udd39 7 active [&hellip;]<\/p>","protected":false},"author":2,"featured_media":3220,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[26,33],"tags":[],"class_list":["post-3219","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solutions","category-ejornee-s-series"],"_links":{"self":[{"href":"https:\/\/www.lctc-group.com\/cs\/wp-json\/wp\/v2\/posts\/3219","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lctc-group.com\/cs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lctc-group.com\/cs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lctc-group.com\/cs\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lctc-group.com\/cs\/wp-json\/wp\/v2\/comments?post=3219"}],"version-history":[{"count":1,"href":"https:\/\/www.lctc-group.com\/cs\/wp-json\/wp\/v2\/posts\/3219\/revisions"}],"predecessor-version":[{"id":3221,"href":"https:\/\/www.lctc-group.com\/cs\/wp-json\/wp\/v2\/posts\/3219\/revisions\/3221"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.lctc-group.com\/cs\/wp-json\/wp\/v2\/media\/3220"}],"wp:attachment":[{"href":"https:\/\/www.lctc-group.com\/cs\/wp-json\/wp\/v2\/media?parent=3219"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lctc-group.com\/cs\/wp-json\/wp\/v2\/categories?post=3219"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lctc-group.com\/cs\/wp-json\/wp\/v2\/tags?post=3219"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}