{"id":2647,"date":"2023-03-19T17:58:07","date_gmt":"2023-03-19T09:58:07","guid":{"rendered":"https:\/\/www.lctc-group.com\/?p=2647"},"modified":"2025-09-26T17:58:46","modified_gmt":"2025-09-26T09:58:46","slug":"two-h-series-22kw-chargers-installed-in-a-parking-lot-in-heusden-zolder-belgium","status":"publish","type":"post","link":"https:\/\/www.lctc-group.com\/da\/two-h-series-22kw-chargers-installed-in-a-parking-lot-in-heusden-zolder-belgium\/","title":{"rendered":"Two H-Series 22kW Chargers Installed in a Parking Lot in Heusden \u2013 Zolder, Belgium"},"content":{"rendered":"<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone  wp-image-2648\" src=\"http:\/\/www.lctc-group.com\/wp-content\/uploads\/2025\/09\/72cf5e1b-42d7-49e4-b548-5706e467e7b0-169x300.png\" alt=\"\" width=\"460\" height=\"817\" srcset=\"https:\/\/www.lctc-group.com\/wp-content\/uploads\/2025\/09\/72cf5e1b-42d7-49e4-b548-5706e467e7b0-169x300.png 169w, https:\/\/www.lctc-group.com\/wp-content\/uploads\/2025\/09\/72cf5e1b-42d7-49e4-b548-5706e467e7b0-7x12.png 7w, https:\/\/www.lctc-group.com\/wp-content\/uploads\/2025\/09\/72cf5e1b-42d7-49e4-b548-5706e467e7b0.png 236w\" sizes=\"(max-width: 460px) 100vw, 460px\" \/><\/p>\n<p><strong>\ud83d\udd0bH-series \u00a0 \u00a0\ud83d\udccdZolder, Belgium\u00a0\u00a0\u00a0\u00a0\ud83e\uddf0\u00a0Parking Lot\u00a0 \u00a0\ud83d\udcc52023<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><strong>A parking lot in Heusden \u2013 Zolder, Belgium, recently enhanced its EV charging capabilities by installing two H-Series 22kW chargers on a single pole.<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><strong>Udfordring<\/strong><br \/>\nThe parking lot owner needed a powerful and scalable solution to support multiple EV users simultaneously. They sought a system that could provide fast charging while being space-efficient, as the installation was limited to a single pole.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>L\u00f8sning<\/strong><br \/>\nIn 2023, two H-Series 22kW chargers were installed on one pole, providing a dual high-power charging solution. This setup allows two vehicles to charge simultaneously without compromising on speed or efficiency. The compact design of the chargers ensured they could be installed in a space-constrained area, while still providing optimal performance for EV drivers.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>N\u00e6ste trin<\/strong><br \/>\nThe parking lot is now offering fast and efficient EV charging, with plans to potentially expand as the demand for electric vehicles grows.<\/p>","protected":false},"excerpt":{"rendered":"<p>\ud83d\udd0bH-series \u00a0 \u00a0\ud83d\udccdZolder, Belgium\u00a0\u00a0\u00a0\u00a0\ud83e\uddf0\u00a0Parking Lot\u00a0 \u00a0\ud83d\udcc52023 &nbsp; A parking lot in Heusden \u2013 Zolder, Belgium, recently enhanced its EV charging capabilities by installing two H-Series 22kW chargers on a single pole. &nbsp; Challenge The parking lot owner needed a powerful and scalable solution to support multiple EV users simultaneously. They sought a system that could [&hellip;]<\/p>","protected":false},"author":2,"featured_media":2648,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[34],"tags":[],"class_list":["post-2647","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-h-series"],"_links":{"self":[{"href":"https:\/\/www.lctc-group.com\/da\/wp-json\/wp\/v2\/posts\/2647","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lctc-group.com\/da\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lctc-group.com\/da\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lctc-group.com\/da\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lctc-group.com\/da\/wp-json\/wp\/v2\/comments?post=2647"}],"version-history":[{"count":2,"href":"https:\/\/www.lctc-group.com\/da\/wp-json\/wp\/v2\/posts\/2647\/revisions"}],"predecessor-version":[{"id":2650,"href":"https:\/\/www.lctc-group.com\/da\/wp-json\/wp\/v2\/posts\/2647\/revisions\/2650"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.lctc-group.com\/da\/wp-json\/wp\/v2\/media\/2648"}],"wp:attachment":[{"href":"https:\/\/www.lctc-group.com\/da\/wp-json\/wp\/v2\/media?parent=2647"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lctc-group.com\/da\/wp-json\/wp\/v2\/categories?post=2647"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lctc-group.com\/da\/wp-json\/wp\/v2\/tags?post=2647"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}